IT DOESN´T GET ANY BETTER

FULL SPEED AHEAD

The greatest possible flexibility when changing location
From the 1st to the 6th floor
From the 6th to the 12th floor, etc
Generous conveying distances

SAVE TIME & MONEY

The variable conveying capacity will increase efficiency at construction sites, because time-consuming retooling has been made unnecessary. No more rights of recourse from the builder because of corrosion or paint residue on the façade. We guarantee it!

THE ADVANTAGES AT A GLANCE

Robust construction for the toughest uses
Reliable and low-cost operation
Modular construction guarantees suitability for all performance ranges

IT CAN ALSO OFFER

Small but powerful
Extreme ease of operation
Stainless steel guarantees freedom from corrosion









MAI International GmbH, Werkstraße 17, A-9710 Feistritz/Drau
P.O. Box 8, Austria, Europe, E-Mail: mai@mai.at, Internet: www.mai.at
Tel.: +43(0)4245/6233-0, Fax: +43(0)4245/6233-10